Skip to content

Cubic Yard Calculator

Convert length, width and depth into cubic yards, in any mix of feet, inches, yards or meters.

Shape

Mix units freely, for example length in feet and depth in inches.

0 cubic yards
  • Cubic feet0
  • Cubic meters0
  • Cubic inches0
  • Area (top)0

Bulk materials like soil, gravel, mulch and concrete are sold by the cubic yard.

Show the formula

  

Quick answer: length × width × depth in feet ÷ 27. Convert inches to feet first, so divide by 12 before multiplying. Skip that and the concrete, gravel, soil, or mulch order inflates twelvefold overnight.

Picture a 12 × 10 ft garden bed filled 3 in deep. Three inches becomes 0.25 feet, giving 30 cubic feet, and 30 cu ft ÷ 27 lands at 1.11 cu yd, one modest delivery.

Results update instantly, then convert to tons so tonnage and truckloads match what the scale house expects.

Call it a Free Contractor Tool for construction materials.

What Is a Cubic Yard Calculator?

A cubic yard is 27 cubic feet, a block measuring 3 ft × 3 ft × 3 ft. That unit matters because ready-mix plants and landscape yards price everything by it, not by the bag.

A cubic yard calculator measures the volume of a space that needs to be filled or covered. You input the dimensions of an area, and it returns the amount of material needed without pencil arithmetic.

Field tapes read differently, so the calculator accepts inches, feet, yards, centimeters, and meters. It works out cubic feet, then converts it to cubic yards, keeping length, width, height, and depth honest across mixed units.

Bulk materials like concrete, gravel, soil, and mulch get sold and delivered in yards, which is why construction, landscaping, and gardening crews all lean on this before placing every phone order to a local supplier.

Add a price per cubic foot, price per cubic yard, or price per cubic meter, and it converts the volume into the cost of materials. Any user can compare supplier quotes without reopening a spreadsheet.

How to Calculate Cubic Yards

Every job site asks the same question: how many cubic yards? Topping a driveway with gravel, spreading mulch—the math is identical: ( L × W × D in ft ) ÷ 27 = Cubic Yards.

Why the divide-by-27 step? A cube 3 feet on every side holds 3 × 3 × 3 = 27 cubic feet. Most slabs, driveways, and fill projects are measured in inches of depth; convert first.

A 4-inch pour: 4 ÷ 12 = 0.333 feet deep. 10 ft × 10 ft area? 10 × 10 × 0.333 returns 33.3 cubic feet; 33.3 cubic feet ÷ 27 gives about 1.23 cubic yards.

Irregular area? Break it into rectangles, calculate each one separately, and add the results together. Add a waste allowance of 5–10% for spillage, compaction, uneven subgrade; a short load costs far more than extra material.

Suppliers sell ready-mix in fixed increments; round up. A 10 x 20 ft driveway with 6 inches of gravel: (10 x 20 x 0.5) / 27 = 3.7 cubic yards, roughly 5.2 tons of gravel.

Cubic Yards vs Cubic Feet

One cubic yard equals 27 cubic feet, yet nobody tapes yard by yard. Crews measure a project in feet, while Suppliers sell concrete, gravel, sand, and topsoil by the cubic yard, so both units matter.

Going cubic feet to cubic yards, divide by 27; backward, multiply by 27. 27 Cubic Feet ÷ 27 = 1 Cubic Yard, while a trench of 64 Cubic Feet ÷ 27 = 2.37 Cubic Yards.

Linear math trips people. Convert feet into yards? Divide the measurement by 3: 12 feet ÷ 3 = 4 Yards. Convert inches into yards? Divide it by 36: 24 inches ÷ 36 = 0.67 Yards.

Software converts cubic meters into cubic yards by multiplying the volume in cubic meters by 1.308: 3 Cubic Meters x 1.308 = 3.92 Cubic Yards. For inches, divide the volume (in cubic inches) by 46,656.

To convert volume to weight, multiply cubic yards by the material density: about 2.03 tons/yd³ for concrete, 1.4 for gravel, 1.35 for sand, and 1.1 for screened topsoil. Add 5–10% for waste before you order.

Calculating Cubic Yardage for Different Shapes

Square forms are the easy case. Projects with cylinders, posts, columns, triangular prisms, ramps, or slopes need different shapes of volume calculations, and guessing them as plain rectangles routinely overorders by a third or more.

A Rectangle stays simple: CY = (Length x Width x Depth in ft) / 27. That 27 means Cubic feet per cubic yard, from 3 x 3 x 3. Keep all Dimensions in feet, always.

The volume of a cylinder uses two measurements: radius and height. Square the radius, multiply by π (3.14) for the area of the circle, then apply Volume = π × (Radius)^2 × Height before dividing.

A sonotube Cylinder: CY = (π x (Diameter/2)² x Depth in ft) / 27. Triangle? A rectangular box sliced in half diagonally: CY = (0.5 x Base x Height x Depth in ft) / 27.

Whatever the formula, Depth in inches must divide by 12 to convert to feet before calculating. Weight follows: Tons equal Cubic Yards x Material Density, which varies by material: gravel 1.4, concrete 2.0, mulch 0.4.

Cubic Yards to Tons Conversion

Weight matters for two reasons. First, suppliers often sell heavy materials like gravel and sand by the ton, not by the yard. Second, dump trucks carry weight limits that run out long before space does.

The formula is short: Tons = Cubic Yards x Material Density. But materials weigh very different amounts per cubic yard, which affects delivery costs and exactly how many truck trips a single job actually needs.

Topsoil sits at 1.1 tons per cubic yard, Dirt or Fill at 1.15 tons per cubic yard, Sand near 1.3 tons per cubic yard, and Gravel or Crushed Stone around 1.4 tons per cubic yard.

A standard 10-yard dump truck is rated for about 14 tons. Load Concrete (wet) at 2.0 tons per cubic yard and you fill the truck by weight before it reaches volume capacity, every single time.

Mulch (wood) weighs 0.4 tons per cubic yard, the lightest common material. Order lightweight materials by volume, heavy ones by weight. Moisture content shifts weights 5-15%, so confirm with your supplier before ordering by ton.

What a Cubic Yard Weighs and Costs by Material

Price per yard means little until weight enters. Ready-mix concrete runs ~4,050 lb per yard, 2.03 tons, at roughly $125–175 delivered, and that delivered figure often quietly hides short-load fees on anything under four yards.

Crushed stone and gravel weigh ~2,800 lb, or 1.40 tons, priced $15–75 per yard depending on stone size and haul distance. Sand usually lands near ~2,700 lb, 1.35 tons, typically $15–50 at most regional pits.

Screened topsoil usually comes in around ~2,200 lb, 1.10 tons, at $20–60 per yard. Bark and wood mulch stay surprisingly featherweight at ~800 lb, 0.40 tons, costing $30–60, often more than the soil underneath it.

Asphalt (hot mix) is the surprise: ~3,900 lb, 1.95 tons, priced $80–160 per yard. Nearly concrete weight, it punishes small trucks and trailers. These Weights reflect dry-material averages, not what actually arrives after a rain.

Wet sand and saturated topsoil run 15–25% heavier. That matters when a load is priced by the ton or a truck already sits near its axle limit; the same yard simply costs and weighs more.

How Far One Cubic Yard Spreads

Every spreading question traces back to 27 cu ft per yard. Divide 324 by depth in inches for coverage. At 1 in, a yard covers 324 ft², ideal for Topdressing or a thin mulch refresh.

At 2 in, coverage drops to 162 ft², suiting Mulch beds or a sand leveling course. At 3″ depth, expect ~108 sq ft, the usual zone for Standard mulch, paver bedding, and light aggregate layers.

Patios, walkways, and slab pours usually sit at 4 inches.

Go to 6 in and you get 54 ft², right for a Driveway slab, compacted subbase, Driveway gravel base, or structural fill. At 8 in, only 40 ft² remains, reserved for Footings and heavy-load aggregate.

A 12″ depth leaves ~27 sq ft, the territory of Deep topsoil, fill, trench stone, Trench backfill, and deep fill. Knowing How far one cubic yard spreads at common depths prevents those shocking second deliveries.

Moving a Cubic Yard: Real-World Equivalents

Volume on paper always hides the labor. A Contractor wheelbarrow holds 6 ft³, or 0.22 yd³, meaning ~5 loads per yard. Ten yards of topsoil translates to roughly fifty sweaty trips across a muddy backyard.

A Half-ton pickup bed, level full, carries ~2 yd³ mulch but 1 yd³ soil. The pickup, rated for a cubic yard by volume, is still often over its weight rating before the bed is full.

That’s because one yard of wet soil weighs more than a ton. Check payload, not just bed volume, especially after heavy rain.

A Single-axle dump truck carries 5–7 yd³, delivering Multiple yards per trip. A Tandem dump truck handles 10–14 yd³, standard for Bulk delivery when long driveways, building pads, or yard-scale grading jobs require serious volume.

Bags change everything. 2 ft³ bagged mulch equals 0.074 yd³, so 13.5 bags per yard; 0.5 ft³ bagged soil needs 54 bags; an 80 lb concrete bag yields 0.022 yd³, requiring 45 bags per yard.

How Much Material Do I Need?

Coverage depends on material type, depth, and project requirements.

Driveway gravel at 4" depth on a 20 ft x 40 ft driveway needs about 10 cubic yards, or 14 tons of crushed stone. A standard dump truck holds 10 cubic yards, so one delivery.

A 4 ft x 8 ft raised bed at 12" depth takes about 1.2 cubic yards of topsoil; a 10 ft x 10 ft slab, 4" thick, needs roughly 1.2 cubic yards of concrete too.

Mulch for a 200 sq ft bed area at 3" depth runs about 1.9 cubic yards. A 100 sq ft patio base of sand at 1" depth needs about 0.3 cubic yards, one pickup’s worth.

Fill dirt for a low spot, 10 ft x 10 ft x 6 inches deep, needs about 1.9 cubic yards. Always order 5-10% extra: settling, spillage, uneven subgrades. Round up to the nearest quarter yard.

Where Cubic Yard Calculations Go Wrong

Most common mistake: Forgetting to convert inches to feet before calculating. When depth is 4 inches, people use 4 instead of 0.333; the order comes out 12x too high. Divide inches by 12, every time.

Calculating area instead of volume runs second. Customers order 200 square feet of topsoil; Square feet is area, suppliers need cubic yards. Depth turns area into volume; skipping it means ordering way too little material.

Mixing up tons and cubic yards costs money. The calculator gives cubic yards, the supplier quotes in tons. One yard of gravel weighs 1.4 tons; One yard of mulch 0.4 tons. Do the conversion first.

Ignoring compaction bites. Gravel and fill dirt compact 10-15% after spreading and traffic. A 6-inch gravel driveway base needs 6.5-7 inches of material installed to finish at 6 inches, so experienced contractors keep adding 15%.

Skipping the 10% waste factor hurts: Uneven ground, depth variation, small spills add up fast. Running short means placing a second order that costs time, delivery fees, a week’s delay if material is on backorder.

How to Use the Cubic Yard Calculator

  1. Choose the shape. Rectangle for beds, slabs, trenches and boxes. Circle / cylinder for round beds, holes, tanks and columns.
  2. Enter each measurement and pick its unit. Feet, inches, yards, meters or centimeters. Mixing them is fine.
  3. Set how many. For several identical areas, enter the count.
  4. Read the result. You get cubic yards plus cubic feet, cubic meters and cubic inches. Open Show the formula to see every step.

Uses for a Cubic Yard Calculator

Measurements in cubic yards remain the convenient way to measure large quantities of concrete, gravel, dirt, and mulch. Many Industries measure volume in cubic yards, cubic feet, or cubic meters, depending on region and trade.

In Landscaping, the tool estimates the amount of mulch, soil, or gravel needed for flower beds, driveways, and paths.

In Construction, it measures the volume of concrete, sand, or fill dirt required for foundations, sidewalks, and other structures. Foremen use it to double-check takeoffs before committing to a pour schedule with the batch plant.

Gardening benefits too. Figuring compost, topsoil, and materials needed for planting in raised garden beds keeps hobbyists from buying forty bags when one bulk yard often costs less and arrives in a single tidy drop.

Waste Management crews estimate the volume of debris and waste material removed from a site, which determines the dumpster size. In every case, landscaping and construction decisions start with the same three dimensions multiplied together.

Cubic Yard Reference Table for Common Projects

A reference table like this is useful for sanity-checking a number before you order. Typical slab, driveway, and fill jobs fall into predictable ranges, so a wildly different result usually signals a unit slip somewhere.

The method never changes: Multiply length × width × depth with every measurement in feet, then divide by 27. The figures below show cubic feet and cubic yard totals for jobs crews quote every week.

Slabs at four inches: 10 by 10 equals 33.3 cubic feet, 1.23 yards. A 12 by 12 patio holds 48 cubic feet, 1.78 yards. A 20 by 20 pad needs 133 cubic feet, 4.94 yards.

Gravel driveways at six inches: 10 by 20 equals 100 cubic feet, 3.7 yards. A 12 by 40 runs 240 cubic feet, 8.89 yards. A 20 by 40 driveway reaches 400 cubic feet, 14.8 yards.

Fill and soil jobs: a 4 by 8 raised bed at twelve inches holds 32 cubic feet, 1.19 yards. Mulching 200 square feet at three inches uses 50 cubic feet, 1.85 yards, before waste allowance.

Practical Examples

Tap a project to load dimensions into the cubic yard calculator. Concrete Patio uses a 12 ft × 12 ft × 4 in slab, the typical backyard pour, producing a Volume of ~1.8 cu yd.

At roughly two tons per yard, that patio’s Weight comes near 3.6 tons, about 7,200 pounds. Order two full yards from the plant, since most ready-mix suppliers dispatch in quarter-yard increments with a short-load minimum.

9 cu yd and ~12.4 tons. One tandem truckload covers it, with some left for washout repairs.

A Mulch Bed measuring 20 ft × 10 ft × 3 in decorative mulch needs ~1.9 cu yd, weighing just ~0.8 tons. A pickup handles it in one trip, though buying bagged means twenty-six bags.

The Topsoil Lawn, 50 ft × 20 ft × 4 in new lawn grade, demands ~12.3 cu yd and ~13.6 tons. That nearly maxes a tandem dump truck by weight, so confirm moisture before dispatch.

Cubic Yards for Every Material

Treat this page as a hub to calculate cubic yards for your project, not a single-material shortcut. Once volume is settled, dedicated tools add cost lines and supplier-specific outputs that a general calculator leaves out.

The gravel calculator converts yards into tons and delivery cost. The mulch calculator translates volume into bags. The topsoil calculator focuses on lawn grading, while the sand calculator targets the thin bedding layers beneath pavers.

Grading low spots? The fill dirt calculator handles rough grade work. For pours, the cubic yard concrete calculator helps calculate cubic yards concrete volume that matches what dispatch asks for when you phone the plant.

Pair results with the concrete estimator for quote-ready pricing, or open the full concrete calculator for bags, trucks, and slab diagrams. Each of these tools starts from the exact same yardage you calculated right here.

Understanding cubic yards of concrete and tons of gravel prevents the most common ordering mistake: confusing square feet (area) with cubic yards (volume). Depth must be in the equation every time, whatever material you’re buying.

Frequently Asked Questions

How Do I Calculate Cubic Yards?

Convert length, width and depth to feet first, multiply them into cubic feet, then divide by 27. This calculator handles that formula automatically, inches included.

How Much Is A Cubic Yard?

Picture a cube 3 feet on every side: 27 cubic feet. Spread it 1 inch deep and it covers 324 ft²; at 6 inches, only 54. Price swings with regional variation, plus a delivery fee.

How Many Cubic Feet Are In A Cubic Yard?

Exactly 27: 3 × 3 × 3 = 27.

How Do I Convert Cubic Yards To Tons?

Volume alone never tells a dispatcher weight. Multiply cubic yards by material density: gravel near 1.4 tons, sand 1.35, topsoil 1.1, mulch 0.4, concrete about 2.03. Five yards of gravel therefore weighs roughly 7 tons.

How Many Cubic Yards Of Concrete Do I Need For A Slab?

Take a 10 × 10 slab at 4 inches thick: thickness becomes 0.333 feet, giving 33.3 cubic feet, or 1.23 cubic yards. Pour day punishes shortfalls, so order 5–10% extra for spillage and uneven subgrade.

How Do I Measure Depth In Inches For A Cubic Yard Calc?

Field crews think in inches, the formula thinks in feet. Measure depth in inches, then divide by 12, so 6 inches becomes 0.5 feet.

How Much Extra Material Should I Order For Waste?

A short load costs more than leftovers ever will. Add 5–10% waste for concrete slabs and footings, 10–15% for compacted gravel over irregular terrain, and settling room for mulch. Extra material beats a second delivery.